. . .
07 Feb
07Feb

After years in which the cellular antenna placed above the Ramat Beit Shemesh C2 neighborhood and providing almost single coverage to the entire area, operated on a generator with incessant malfunctions, the theft of diesel fuel or the weather that disabled the antenna and reception.

After much suffering by the residents and media pressure on the "Beit Shemesh News" network about the failure of reception - today the antenna was connected to electricity, with the help of a tens of meters long cable that stretched from Yona Ben Amitai Street to an antenna placed above Sredut Eliyahu HaNavi.


This is only three weeks before the elections in the city, when the employees of the electric company have not yet had time to complete the connection and an election video of the RA has already been filmed there, in a cynical attempt to cover up the failure of the term.

Comments
* The email will not be published on the website.